East Valley Water District Project 2

Term: Fall 2021

Faculty Advisor:

Project Description:

As this is not a timesensitive initiative by EVWD and the full scale of the desired product is likely a larger project than a single semester. We can work with the group to break this into several smaller projects as follows:

1st project: Database integration and model development

2nd project: Demand predictions.

3rd project: User interface